Do You Want to Offset the Cost of Your Boiler Rental?

 

WARE delivers rental boilers of any size: Trailer mounted rental boilers – up to 75,000 lb/hr, Mobile boiler rooms – 50HP to 1000HP, Skid-mounted rental boilers – up to 250,000 lb/hr, Trailer mounted Superheated rental boilers – up to 75,000 lb/hr.

Ware’s high efficiency rental boilers save so much in fuel costs that the savings can often offset the cost of the rental!  Pentad is available to help you plan your scheduled shut-downs or respond quickly to your boiler rental needs.  Also, remember that WARE can deliver rental chillers of any size.  Call us today!

WARE delivers rental chillers of any size:

 

Siemens Combustion Controls Model LMV52

New Flue Gas Collector options for LMV52 available as of October 17th, 2016.

Incorporating all of the features of the LMV51, the LMV52 Linkageless Burner Management System offers high impact options including O2 Trim, Variable Frequency Drive control, and additional actuator control possibilities. The LMV52 provides the ultimate flexibility to safely meet control needs, improve process control and reduce energy costs.

Preparing For Your Winter Boiler Shutdown

To help you plan for upcoming winter shutdowns, we’ve prepared a common spare parts list that may help in your planning and ordering.
ð‰ð€ð¢ Fireside gaskets or gasket kits/rope
ð‰ð€ð¢ Waterside gasket kits/Handhole gaskets
ð‰ð€ð¢ Sight glass, gaskets, and washers
ð‰ð€ð¢ Spare ignitors and ignition transformers
ð‰ð€ð¢ Spare combustion controls, Flame Safeguards, and scanners
ð‰ð€ð¢ Pressure and temperature gauges
ð‰ð€ð¢ Water level components – probes and switches
ð‰ð€ð¢ Gas and air pressure switches
If running in the winter months is critical, for heating or process, it’s always good to have long lead time for parts that are harder to get in a rush.These items below can be tailored to your specific boiler brand and are harder to find because they are too specific for parts houses to stock and often take 4-6 weeks to get.
ð‰ð€ð¢ Boiler Feedwater pumps
ð‰ð€ð¢ Blower motors and wheels
ð‰ð€ð¢ Gas valves
ð‰ð€ð¢ Pilot assemblies/diffusers

Ware has over 40,000 boiler parts in stock! Contact us for the spares you need today!

Webster’s 2017 Combustion College is Open to Registration!

Webster Combustion Technology is planning on another great Combustion College this Spring!

 

The Webster Combustion College webpage is now active and ready for registrations for their 2017 Spring classes.

 

Here is a link directly to the registration page: 

 

http://www.webster-engineering.com/combustion-college.

 

Webster is changing their format somewhat this year in hopes that they can accommodate more attendees and provide more focused training, but they still expect their classes to fill up very quickly.

 

The final date for registration is February 10, 2017, so please sign up as soon as possible to confirm your spot in one of Webster’s sessions.

 

 

 

New! Series MP7000 Metering Pump From Neptune!

Neptune is pleased to announce the launch of its new Series MP7000 mechanically actuated diaphragm metering pump. Designed to be a low-flow version of the Neptune Series MP7100 metering pump, the Series MP7000 incorporates a wide variety of design features that provide reliable and accurate dosing of a wide range of mild to aggressive chemicals, including those used in industrial and municipal water and wastewater treatment, chemical processing and agriculture.

For more information or to get your quote, email us at sam@pentadassoc.com!

Zeeco Academy Invitation

 

We cordially invite you to participate in our 2017 Spring Zeeco Academy, located at Zeeco’s corporate headquarters in Broken Arrow, Oklahoma.

 

April 24th – 28th

 

Attendees are welcome to attend one or both of the following sessions:

 

·       Process Burners, April 24th – 25th

·       Flares and Vapor Control, April 26th – 28th

 

Attendees will also tour our largest in the world ISO-certified industrial scale research and test facility and partake in hands-on testing.

Zeeco will cover food, local transportation, and other training expenses.

Attendees will be responsible for transportation to Tulsa and lodging.

Space is limited. For more details, contact Zeeco’s Business Development Coordinator, Victoria Brooks, at victoria_brooks@zeeco.com.

December Factory of the Month ð‰ð€ð“ Fluid Engineering

In 1986, the Fluid Engineering division of TM Industrial Supply, Inc. was established to design and manufacture specialized strainers used in the power generation, utility, oil & gas, biofuels, wastewater, and water treatment markets

 Their engineered filtration systems include automatic self-cleaning strainers, strainer skid packages, simplex, duplex and Y strainers.

 We are very proud to have been the local representative of Fluid Engineering for 24 years!

Fluid Engineering has a wide range of solutions to meet your filtration needs, from their standard product offerings to custom designs for unique applications.  Please contact us with your requirement!

 

TM Filtration Desander for New Capped Gas Wells

As we enter this new year, some companies are projecting that it will be a record year for drilling new gas wells in the Shale Formation, and there is a greater need to remove any sand that may come out with the natural gas to protect valves, meters and other equipment.

 

Pentad Associates and TM Filtration have come out with a new Desander to remove sand out of new and capped gas wells before sending the natural gas to the pipeline.

 

TM Filtration Model 384 (Inline-Bulk Desander/Deliquidizer Coalescer) catalog information is now available for pipe line sizes 2” thru 12”.  Please contact us to receive a copy. Sizing will be available in ANSI ratings of 150#, 300# and 600.  Other sizes and pressures available on request.

 

Let us know if we can help with your Desanding requirement.

Meeting ELG Regulations for Coal Power Plants

Graver Water Systems can now provide solutions to meet the more stringent EPA regulations related to the new effluent limitation guidelines (ELGs). 

 

Graver’s experience enables them to provide systems that meet the new removal requirements for arsenic, selenium and mercury.

 

We would be happy to discuss Graver’s capabilities with you.  Please contact us for further information.